TUZ GOLU UNDERGROUND NATURAL GAS STORAGE EXPANSION PROJECT
Implemented to develop Türkiye’s natural gas supply security infrastructure, the Tuz Gölü Underground Natural Gas Storage Facility Capacity Expansion Project is one of the significant investments aimed at increasing strategic energy storage capacity. The joint venture of IC Ictas Insaat – CAMC Engineering undertakes the design and construction works of underground storage areas, surface facilities, auxiliary infrastructure, and pipeline systems within the scope of the EPC contract. Within the scope of the project, the creation of storage caverns located within salt formations, drilling and solution mining operations, and the integration of comprehensive above-ground and underground facilities are carried out.
Project Profile:
| PROJECT DETAIL | DESCRIPTION |
| PROJECT NAME | Tuz Golu Underground Natural Gas Storage Expansion (Phase II) |
| CLIENT | Petroleum Pipeline Corporation (BOTAŞ) |
| CONTRACTOR | China CAMC Engineering Co., Ltd. – IC İçtaş İnşaat Sanayi ve Ticaret A.Ş. Joint Venture |
| CONTRACT TYPE | EPC Contract |
| LOCATION | Sultanhanı, Aksaray, Türkiye |
| COMMENCEMENT DATE | 16 July 2019 |
| COMPLETION DATE | Ongoing (Planned: 30 June 2027) |